Mode Virtual (V) — Deliverables¶
Phase I — Design (2025–2026):
- Monthly reports: due on or before the final day of each month starting in October (short progress update, issues/risks, next steps).
- Phase I Design Report: due 31 Dec 2025, 23:59 local time. Use “2025
Phase I Design Report” as the filename prefix. - Optional Design Video: ≤ 5 minutes, due by 23 Jan 2026 (property of the university; DSATS may use in sites/events).
- Final 2026 results: published June 2026. See 2026 Results.
- Mandatory interoperability check (Mode V): committee-coordinated gate before proceeding with Phase 2 development.
Phase II — Implementation and testing:
- Mode Virtual (V): model improvements/testing and controls development; Phase II test occurred May/June 2026.
- Pre‑recorded team presentation: submitted ~1 week before the test; judges prepare Q&A from it.
Edge‑deployable models
- Expectation: focus your effort on generating/fine-tuning data and optimizing compact multimodal models.
- Inference‑only, offline, JSON outputs (e.g., Explain‑This‑Event or Rig‑State Textualizer).
- Small‑model, edge‑deployable focus: teams may prototype with larger cloud‑hosted models during development, but final deliverables and performance are evaluated using locally run or on‑rig small models under limited inference hardware.
- Suggested caps: ≤2 vCPU or ≤20 W GPU, ≤4–8 GB RAM (non‑LLM) and ≤8 vCPU or ≤1,150 W GPU, ≤16–64 GB RAM (LLM); ≤15 min total inference runtime. Rig compute otherwise open. All AI runs must be offline during judging; no PLC/actuator writes.
- Custom task option: teams may propose a custom offline JSON task with objective ground truth and the same interface for pre‑approval (recommended deadline: 2026‑02‑01). Approved tasks use the same AI sub‑rubric and scale to +10.
Data and documentation packages (Directional challenge excerpts):
- Minimum Curvature trajectory and plan‑vs‑actual plots (TVD vs. VS, vertical section, plan view).
- Directional survey raw data logs with timestamps, measured depth, downhole sensor values (axes + qualifier values), and survey acceptance flags.
- Formation model import: prepared to ingest DSATS‑provided rock model immediately before Phase II.
File Naming Convention:
| Artifact | Format |
|---|---|
| Monthly report | “YYYY‑MM |
| Design report | “2025 |