Mode Physical (P) — Deliverables & Testing¶
Phase I — Design (2025–2026):
- Monthly reports: due on or before the final day of each month starting in October.
- Phase I Design Report: due 31 Dec 2025, 23:59 Local Time; use the naming convention “2025
Phase I Design Report”. - Optional Design Video: ≤ 5 minutes, due by 23 Jan 2026.
- Final 2026 results: published June 2026. See 2026 Results.
Phase II — Implementation and testing:
- Mode Physical (P): model and controls development and rig construction; Phase II test occurred May/June 2026.
- Pre‑recorded team presentation: submitted ~1 week before the test; judges prepare Q&A from it.
Edge‑deployable models
- Expectation: focus your effort on generating/fine-tuning data and optimizing compact multimodal models.
- Inference‑only, offline, JSON outputs (e.g., Explain‑This‑Event or Rig‑State Textualizer).
- Small‑model, edge‑deployable focus: teams may prototype with larger cloud‑hosted models during development, but final deliverables and performance are evaluated using locally run or on‑rig small models under limited inference hardware.
- Suggested caps: ≤2 vCPU or ≤20 W GPU, ≤4–8 GB RAM (non‑LLM) and ≤8 vCPU or ≤1,150 W GPU, ≤16–64 GB RAM (LLM); ≤15 min total inference runtime. Rig compute otherwise open. All AI runs must be offline during judging; no PLC/actuator writes.
- Custom task option: teams may propose a custom offline JSON task with objective ground truth and the same interface for pre‑approval (recommended deadline: 2026‑02‑01). Approved tasks use the same AI sub‑rubric and scale to +10.
Required artifacts (Magnetic surveying excerpts):
- Definitive directional survey (TXT/LAS/CSV) including header info such as school name, survey date, well center (WGS‑84), TVD reference (above block), grid convergence, geomagnetic model, magnetic declination, total azimuth correction, field dip/strength references, and the error model used.
- Autonomous survey process and qualification; provide raw survey data logs with timestamps, measured depth, downhole sensor values (axes + qualifier values), and survey acceptance indicators.
- Telemetry dataset: fixed‑schema
drilling_timeseries.csv(≥1 Hz; D‑WIS names) with semantic headers and units for apples‑to‑apples scoring. - Static logs (suggested): LAS 2.0
wellname_logs.laswith required curves and metadata.
Testing notes:
- Closed‑loop control using downhole data is REQUIRED; failure to integrate downhole measurements into the controller is considered failing for 2024.
- Prepare a test matrix, data handling and visualization plans, and calibration/verification procedures for sensors and instrumentation.
Mandatory Rule
Interop demo is separate and read‑only/shadow; teams MUST NOT write to PLCs/actuators during checks.